UST 한국원자력연구원 ETRL

본문 바로가기
Int. Conf. on Construction Engineering and Management 국제 학술대회 Seoul, Korea

The development of a curtain wall installation robot through the analysis of existing construction processes

Seung-Nam Yu, Chong-Ho Choi, Seung-Yel Lee and Chang-Soo Han
논문 보기 관리자 · 조회 399 · 2005-12-31
ABSTRACT

Automation in construction has been restricted to special classes of tasks. Curtain walls can be handled like standard construction materials; they are heavy but breakable, and are large but require precise installation. These characteristics make the installation of curtain walls ideal for robotic automation. There are two methods for developing construction robots: The first is approving the robot performance and applying it to the current construction methods. The second is admitting the limitation of the current robot technology and trying to optimize the current method of construction to apply the robot system. In this study, we derived the performance requirements of a curtain wall-installation robot. We also tested this robot at a real construction site and evaluated its performance. Finally, the results were analyzed, and we proposed additional research.


Keywords