ISARC 2005
국제 학술대회
Ferrara, Italy
The Analysis of the Curtain Wall Installation Robot: Based on the Test in the Construction Site
S.N. Yu, C.H. Choi, S.Y. Lee, C.S. Han, K.Y. Lee and S.H. Lee
논문 보기
관리자 · 조회 357 · 2005-12-31
ABSTRACT
Automation in construction is one of the important issues in the field of robotics, but is distinct from factory automation (FA). Because of variations in materials and management, the role of automation in construction is often limited. A curtain wall is a large, heavy breakable object and requires precision installation, making it a better candidate for automated installation. A curtain-wall installation robot was built and tested at a real construction site and results were analyzed to refine the new concept of curtain-wall installation automation.
Keywords: Curtain-wall, Automation in Construction, Progress Management, Optimal Mechanic Design, TRIZ Method, Curtain-wall installation Robot, Construction Process Analysis